7,000 m³ tank, Oktan Energy, Szczecin (Poland)

About the project
Erection of tank vol. 7000 m³ for “Octan Energy”, as sub-contractor of “KB Pomorze Ltd”, Shchechin, Poland.
Other projects

Erection of tank vol. 7000 m³ for “Octan Energy”, as sub-contractor of “KB Pomorze Ltd”, Shchechin, Poland.