Pipeline installation
Completed pipeline, equipment and steel structure installation projects for enterprises in Ukraine and the EU. Choose a category to browse.
Projects
Pipeline installationSulphuric acid plant, Crimean Titan PJSC
Installation of process piping and installation of process equipment at Sulfuric Acid Unit of Titan Plant JSC "Crimean Titan" Armyansk.
Pipeline installationRotary furnace gas pipelines, Interpipe Niko Tube
10” interplant gasmain construction, 1”-14” process gas piping construction of rotary furnace at Metallurgic Plant “Interpype Niko Tube”, Nikopol’, Dnipropetrovsk region (General…
Pipeline installationExtraction and preparation shops, Delta Wilmar CIS LLC
Construction of CS and Alloy process piping with diameter from ¾” to 22” during construction extracting and preparation CPF, at the Delta…
Pipeline installationHydropower plant pipelines in the Carpathians
32”-48” Piping works in the mountains, within construction of hydropower plants in the Carpathian Mountains.
Pipeline installationAir separation unit, Linde Gas Ukraine LLC
1”-12” Alloy process pipes construction for transportation of liquid air, nitrogen, oxygen; 1”-48” CS process pipes and 1-10” creep-resistant pipesteam construction at…
Pipeline installationBoiler house, Agro-Sula LLC
Installation of pipelines and equipment during the construction of the Agro-Sula LLC boiler house, Hlobyne, Poltava region.
Pipeline installationPipeline repair, Kremenchuk City Dairy Plant LLC
Weld repair on chlorine pipeline in the place of blowhole, replacement of steam pipelines, removal and installation of safety valves on steam…
Pipeline installationLiquid cargo terminal, JV Risoil Terminal LLC
Installation of 219 mm diameter pipelines at expansion of liquid cargoes tank farm - customer JV Risoil Terminal LLC, Chernomorske town, Odessa…
Continuous casting complex No. 4, Ilyich Iron and Steel Works PrJSC
Installation of technological pipelines, installation of metal structures of the TSA at the facility "Construction of a complex of machines for continuous…
Blast furnace No. 3 overhaul, Azovstal Iron and Steel Works PrJSC
Manufacturing and installation of technological pipelines at the project "Capital repair of blast furnace # 3”. PJSC "MK Azovstal", Donetsk region, Mariupol.
Continuous casting machines No. 2 and 3, ArcelorMittal Kryvyi Rih PrJSC
Installation of technological pipelines at the object "Reconstruction of the continuous casting department with the installation of a complex of machines for…
Lubrication and hydraulics station of hot strip mill 1700, Ilyich Iron and Steel Works PrJSC
Installation of hydraulic and lubrication piping within the scope “Construction, installation and commissioning of the lubrication and hydraulics station with connecting pipelines…
Didn't find a similar project?
Tell us about your task — we'll estimate the cost of installation, fabrication or welding.