Lubrication and hydraulics station of hot strip mill 1700, Ilyich Iron and Steel Works PrJSC
About the project
Installation of hydraulic and lubrication piping within the scope “Construction, installation and commissioning of the lubrication and hydraulics station with connecting pipelines for stand R2, the coilbox and finishing stands No. 5–7 of hot strip mill 1700” as part of the project “Reconstruction of hot strip mill 1700” at Ilyich Iron and Steel Works PrJSC, Mariupol, Donetsk region.
Other projects
