Equipment and steel structure installation
Completed pipeline, equipment and steel structure installation projects for enterprises in Ukraine and the EU. Choose a category to browse.
Projects
Equipment and steel structure installationFiltration system of the central fuel and lubricants depot, Aviatekh LLC
Complex of construction and installation works for modernisation of filtration system of Central FLM warehouse with installation of new fuel pipeline section…
Equipment and steel structure installationHoist monorail, Poltava Oil Extraction Plant – Kernel Group PJSC
Fabrication and installation of steel structures of monorail for a telpher in the CDO building at the facility of Poltava Oil Extraction…
Equipment and steel structure installationWater treatment shop, Prydniprovskyi Oil Extraction Plant – Kernel Group PJSC
Fabrication and installation of steel structures for chemical water treatment facility at "Pridneprovsky Oil Extracting Plant - Kernel Group" PJSC in Kropivnitsky…
Equipment and steel structure installationBrock silos and Stela dryer, Nysa (Poland)
Installation of silos "Brock" in quantity of 3 pcs with capacity of 12900 m3. Installation of "Stella" dryer. Installation of equipment for…
Fuel store and fuel feed hopper for a cogeneration unit, Poltava Oil Extraction Plant – Kernel Group PrJSC
Fabrication and installation of steel structures of a fuel store and of a fuel feed hopper within the Kernel Group LLC project…
Process equipment and boiler house, Monsanto Seeds LLC
Installation of process equipment, reconstruction of the boiler house and installation of steel structures at Monsanto Seeds LLC, Pochuiky village, Zhytomyr region.
Power utility networks of the crushing and transfer station, PivnGZK PrJSC
Construction, installation and commissioning of power utility networks at the crushing and transfer station within the project “Cyclic-and-continuous technology for overburden rock…
Replacement of the EV-320 first distillation stage, Delta Wilmar CIS LLC
Replacement of the EV-320 first distillation stage in the extraction section of the raw material processing shop within the Etalon LLC project…
Corn grits mill, Daksa Bunge LLC
Installation of process equipment within the KES UA Holding LLC project “New construction of a corn grits mill and reconstruction of the…
LAW dryer block, Epicentr K LLC
Construction of a LAW dryer block, Q = 176.7 t, with SBC 3.21 LE2500 cladding within the Epicentr K LLC project “New…
Reconstruction of a woodworking complex, Kronospan Rivne LLC
Construction, installation and repair works within the Kronospan Rivne LLC project “Reconstruction of an industrial complex of buildings and structures for a…
1,200 t unhusked corn dryer, KWS
Equipment installation works, including installation of a 1,200 t unhusked corn dryer, within the projects “Reconstruction of buildings and structures of the…
Didn't find a similar project?
Tell us about your task — we'll estimate the cost of installation, fabrication or welding.