Food
Completed pipeline, equipment and steel structure installation projects for enterprises in Ukraine and the EU. Choose a category to browse.
Projects
Pipeline installationExtraction and preparation shops, Delta Wilmar CIS LLC
Construction of CS and Alloy process piping with diameter from ¾” to 22” during construction extracting and preparation CPF, at the Delta…
Pipeline installationPipeline repair, Kremenchuk City Dairy Plant LLC
Weld repair on chlorine pipeline in the place of blowhole, replacement of steam pipelines, removal and installation of safety valves on steam…
Tank fabrication and erection3,000 and 4,700 m³ tanks for an oil extraction plant, Pivdenne
4 tanks shell plate erected with capacity of 3000 m3 and 1 tank capacity of 4700 m3 at Oil-extracting factory Project, Yuzhny,…
Tank fabrication and erectionTwo 6,700 m³ vegetable oil tanks, EVERI LLC
2 tanks shell plate erected with capacity 6700 m3 EVERI LTD, Mykolaiv.
Oilseed silos, BUNGE
Erection of tanks capacity 11076 m3 in quantity of 6 pieces and Erection of tanks capacity 6631 m3 in quantity of 4…
Gravity pipes, Hlobyne Processing Plant LLC
Fabrication and erection of free-runs Ø 300 mm, connector bends, breechings, dismounting and mend of stopping devices, diverter valves, for Globynskiy reprocessing…
Corn processing plant, Altera Azteca Milling Ukraine LLC
Installation of flat bottom silos in quantity of 6 pcs, capacity 3840 m3 each installation of 4 pcs silos-hoppers, 448 m3 each…
Equipment and steel structure installationBulk materials warehouse at the ADM Sztum oil mill (Poland)
Modification of bulk products warehouse and station for automatic loading of solid residue of oilseeds at the butter factory at the site…
Equipment and steel structure installationConveying equipment, PZZ Lubella (Poland)
Installation of transport equipment for bulk products at the facility PZZ Lubella, delivery of equipment - Cimbria company, Customer - Butimer POLSKA…
Equipment and steel structure installationMain building steel structure upgrade, Poltava Oil Extraction Plant – Kernel Group PJSC
Works on modernisation of steel structures in machine hall of the main building, in boiler hall of the main building, fuel supply…
Equipment and steel structure installationHoist monorail, Poltava Oil Extraction Plant – Kernel Group PJSC
Fabrication and installation of steel structures of monorail for a telpher in the CDO building at the facility of Poltava Oil Extraction…
Equipment and steel structure installationWater treatment shop, Prydniprovskyi Oil Extraction Plant – Kernel Group PJSC
Fabrication and installation of steel structures for chemical water treatment facility at "Pridneprovsky Oil Extracting Plant - Kernel Group" PJSC in Kropivnitsky…
Didn't find a similar project?
Tell us about your task — we'll estimate the cost of installation, fabrication or welding.